We were offered the opportunity to fit this large, new school (660m2) based in Stamford Hill, following a very precise and intricate design.
We began by cleaning each of the numerous rooms which were split over two levels and then primed each of them using F-Ball Stop Gap P131. We then latexed using Stop Gap F-Ball 300HD and feathered the floor to fine fill any last imperfections. This was followed by marking out the rooms using to scale drawings which allowed us to visualise the complex design.
Then came the fitting- we used Armstrong VCT (vinyl composite tiles) to install the required finish which you can see in the images above. The 3.5mm thick 9 inch x 9 inch tiles were individually fitted together to achieve the four different unique patterns.